Who is undertaking the project?

The City of Chattanooga is the main governmental agency responsible for the study. Through the Chattanooga Department of Transportation (CDOT), the City is working closely with key stakeholders including the: Tennessee Department of Transportation, University of Tennessee at Chattanooga, Erlanger Health System, Siskin Hospital for Physical Rehabilitation, Chattanooga School for the Arts and Sciences, River City Company, The Benwood Foundation, Lyndhurst Foundation, Chattanooga Urban Design Studio, and Public Art Chattanooga, as well as others in the project area.

What is the purpose of the project?

The purpose of the project to transform the 3rd and 4th Street corridor (from Lindsay Street to Hampton Street), including the connection to Riverfront Parkway, into an aesthetically pleasing, safe, and accessible facility that reconnects and extends the downtown grid. The new connections to the existing neighborhoods, the University of Tennessee at Chattanooga, the Chattanooga School for the Arts & Sciences, and Erlanger Hospital are intended to encourage economic development and provide an enhanced connection among the community assets, direct connections to the Riverwalk, and improved vehicular, transit, pedestrian, and bicycle amenities.

What is the project area?

For the Planning Phase of the project, the project limits are defined as follows:

  • Lindsay Street and Houston Street, from Riverfront Parkway to McCallie Avenue for one-way to two-way conversion.
  • Riverfront Parkway, from Lookout Street to Central Avenue Extension.
    • Including potential intersections of Siskin Drive and Hampton Street.
    • Including access to bicycle/pedestrian facilities.
  • 3rd Street, from Lindsay Street to Hampton Street.
    • Including Hampton Street to Central Avenue improvements included in concept plans prepared by Erlanger Hospital.
  • 4th Street, from Lindsay Street to the intersection with Riverfront Parkway, from Lookout Street to 500’ east of the 4th Street on-ramp.

At the conclusion of the Planning Phase, the scope of the project to be evaluated as part of the NEPA process, as well as the preliminary design phase will be established.

What are the anticipated outcomes of the project?

As part of the Planning Phase, a conceptual master plan will be developed to identify vehicular, pedestrian, and bicyclist circulation and connections; land uses, open space, economic development, street landscaping and design, as well as transit services and parking. The master plan will based on available data, a review of prior studies, stakeholder interviews, and input received during the initial charrette. This master plan will form the basis for the portion of the project that will be evaluated during the NEPA Phase and the portion of the project that will be ultimately designed and constructed.

What types of improvements will the project examine?

The purpose of the project to transform the 3rd and 4th Street corridor (from Lindsay Street to Hampton Street), including the connection to Riverfront Parkway, into an aesthetically pleasing, safe, and accessible facility that reconnects and extends the downtown grid. The objectives of the project are to improve multimodal circulation in the area, improve safety for cars, transit riders, as well as bicyclists and pedestrians, encourage economic development, and alleviate stormwater issues.

The improved and new connections to the existing neighborhoods, the University of Tennessee at Chattanooga, the Chattanooga School for the Arts & Sciences, and Erlanger Hospital are intended to encourage economic development and provide an enhanced connection among the community assets, direct connections to the Riverwalk, and improved vehicular, transit, pedestrian, and bicycle amenities.

What types of the improvements will the project include?

In keeping with the City of Chattanooga’s Complete Streets Policy, the project will be designed, built and operated to enable safe access for all users (pedestrians, bicyclists, motorists and public transportation users of all ages and abilities) to safely and independently move along and across the street right-of-way.

How do I provide my input?

Your input can be provided via this website and opportunities for input will be provided during the many public and stakeholder outreach activities that are planned to occur throughout all phases of the project.

Chattanooga Department of Transportation